{"id":642,"date":"2019-03-14T23:17:37","date_gmt":"2019-03-14T20:17:37","guid":{"rendered":"http:\/\/www.ernasiletisim.com\/tr\/?p=642"},"modified":"2022-05-15T21:37:07","modified_gmt":"2022-05-15T18:37:07","slug":"ready-to-use-data-center-solutions","status":"publish","type":"post","link":"https:\/\/www.ernasiletisim.com\/en\/solutions\/ready-to-use-data-center-solutions.html","title":{"rendered":"Ready To Use Data Center Solutions"},"content":{"rendered":"\n<div class=\"wp-block-group\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n<div class=\"wp-block-columns are-vertically-aligned-center is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-vertically-aligned-center is-layout-flow wp-block-column-is-layout-flow\">\n<h2 class=\"wp-block-heading\">ROOM CONSTRUCTION<\/h2>\n\n\n\n<p id=\"block-2bc5b38c-4b53-4e41-a1c3-069fb5486008\">In order for all the service offered through host computer \u2013 internet \u2013 local network there need to be a suitable computer room. This makes computer rooms one of the most crucial elements of information infrastructure, and places very high importance to data centers construction. For the construction of the computer room, the room needs to be coated with double sided plasterwork rockwool. The rockwoll provides humid and sound insulation, and sound absorption, and rockwool ceiling floor tiles should be used. Then raised floor should be built. Then bearing legs which have point charge and spring charge features, should be installed. These will be the sound structures that will carry products which will be placed on the flooring. After that antistatic floor covering should be built. While doing the flooring, attention should be given to reasure the raised floor should be at least 50 cm above the the floor so as to allow cold air-flow. Aside from this, the materials for the flooring should be able to carry up to 1500kg pressure. To carry cabinet weight easily, supporting legs that clasp the tiles under the floor should be directly under where the cabinet\u2019s legs will be places. For the construction of the computer room, there should be a fire-proof steel door, and it should be protected by durable locks. There should be a good water and heat insulation. In case of earthquakes, racks should be mounted to the walls. When the construction is done and the keys are ready to be turned, computer room should be ready to give professional service.<\/p>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-vertically-aligned-center is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:40%\">\n<div style=\"height:30px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<figure class=\"wp-block-image size-large custom-image1 is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"1024\" src=\"https:\/\/www.ernasiletisim.com\/en\/wp-content\/uploads\/ernas-oda-insaati-page-inner-1024x1024.jpg\" alt=\"\" class=\"wp-image-1311\" srcset=\"https:\/\/www.ernasiletisim.com\/en\/wp-content\/uploads\/ernas-oda-insaati-page-inner-1024x1024.jpg 1024w, https:\/\/www.ernasiletisim.com\/en\/wp-content\/uploads\/ernas-oda-insaati-page-inner-300x300.jpg 300w, https:\/\/www.ernasiletisim.com\/en\/wp-content\/uploads\/ernas-oda-insaati-page-inner-150x150.jpg 150w, https:\/\/www.ernasiletisim.com\/en\/wp-content\/uploads\/ernas-oda-insaati-page-inner-768x768.jpg 768w, https:\/\/www.ernasiletisim.com\/en\/wp-content\/uploads\/ernas-oda-insaati-page-inner.jpg 1280w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n<\/div>\n<\/div>\n<\/div><\/div>\n\n\n\n<h2 class=\"wp-block-heading\">RAISED FLOORING<\/h2>\n\n\n\n<p>The raised flooring inside the computer room is a contruction that consists of tiles places on top of a system that raises the floor. Their purpose is to create space for the infrastructure members to move inside the area when needed so as to make it easy to respond. Aside from creating space, it hides the infrastructure and contributes to the enegry efficiency. Raised flooring is created from non-hazardous substances on human health, and materials that don\u2019t gather dirt or dust, and it\u2019s also fire, corrosion and humid resistant. Furthermore, thanks to its anti-static nature, it\u2019s useful for discharging static electiricty.<\/p>\n\n\n\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:40%\">\n<figure class=\"wp-block-image size-large custom-image2 is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"1024\" src=\"https:\/\/www.ernasiletisim.com\/en\/wp-content\/uploads\/ernas-data-center-kablo-page-inner-1024x1024.jpg\" alt=\"\" class=\"wp-image-1313\" srcset=\"https:\/\/www.ernasiletisim.com\/en\/wp-content\/uploads\/ernas-data-center-kablo-page-inner-1024x1024.jpg 1024w, https:\/\/www.ernasiletisim.com\/en\/wp-content\/uploads\/ernas-data-center-kablo-page-inner-300x300.jpg 300w, https:\/\/www.ernasiletisim.com\/en\/wp-content\/uploads\/ernas-data-center-kablo-page-inner-150x150.jpg 150w, https:\/\/www.ernasiletisim.com\/en\/wp-content\/uploads\/ernas-data-center-kablo-page-inner-768x768.jpg 768w, https:\/\/www.ernasiletisim.com\/en\/wp-content\/uploads\/ernas-data-center-kablo-page-inner.jpg 1280w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<h2 class=\"wp-block-heading\">FIRE SENSING &amp; EXTINGUISHING SYSTEMS<\/h2>\n\n\n\n<p>Both automatic and manual fire sensing and warning systems should be used in data centers. In case of a fire, necessary precautions should be taken so as not to respond the fire with water, and halon gas should be used as extinguisher instead. Fire alarm should be configured in a way to warn above and below the 10-30 degrees treshold.<\/p>\n\n\n\n<div style=\"height:20px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h2 class=\"wp-block-heading\">FIREPROOF PAINT &amp; SOLUTION PROCESS<\/h2>\n\n\n\n<p>Fire-proof paint and solution processes molecularly capsulates the surface, and cuts its contact with oxygene. This creates a very strong heat resistancy. Thanks to the active components inside it, fire-proof painting prevents the heat from reaching to a point where a fire can start, and consequently products don\u2019t ever burn.<\/p>\n<\/div>\n<\/div>\n\n\n\n<h2 class=\"wp-block-heading\">EPOKXY PAINT &amp; COATING<\/h2>\n\n\n\n<p>Epoxy paints and coatings are two components systems with high physical and chemical resistancy. Epoxy is a durable resin that has modern features. Epoxy floor coating is a technological construction material that is designed for coating every type of land and sea structure floor which might withness the worst weather conditions so as to provide an aesthetic protection. Its highly adhesive nature, and mechanical and physical durability makes Epoxy paint suitable for connecting and pasting different kinds of construction materials.<\/p>\n\n\n\n<div class=\"wp-block-group\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n<div class=\"wp-block-columns are-vertically-aligned-center is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-vertically-aligned-center is-layout-flow wp-block-column-is-layout-flow\">\n<h2 class=\"wp-block-heading\">DATA CENTER &amp; CABINET INSTALLATION<\/h2>\n\n\n\n<p id=\"block-2bc5b38c-4b53-4e41-a1c3-069fb5486008\">During data center and cabinet insallations, outer factors should be taken into consideration. First precaution againts natural disasters are placed then place preference, heat control, humidity control, dust control are applied. After these, technical precaution such as cabinet order, energy control, cabling inside the cabinets, and regular records are installed. Finally security and monitoring installation are carried out.<\/p>\n\n\n\n<div style=\"height:20px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h2 class=\"wp-block-heading\">ENVIRONMENTAL CONDITIONS MONITORING SYSTEMS<\/h2>\n\n\n\n<p id=\"block-2bc5b38c-4b53-4e41-a1c3-069fb5486008\">Environmental condition monitoring systems inside the system rooms include weather conditions that are related to heat, humidity, dew, and electrical conditions like \u00a0network voltage frequency, UPS voltage frequency, earthing voltage, surrounding conditions, air conditioners, UPS, generator and such. These parameters can also sense any bypass-breakdown through dry contact entries.<\/p>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-vertically-aligned-center is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:40%\">\n<div style=\"height:30px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<figure class=\"wp-block-image size-large custom-image1 is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"1024\" src=\"https:\/\/www.ernasiletisim.com\/en\/wp-content\/uploads\/ernas-kabinet-kurulumu-page-inner-1024x1024.jpg\" alt=\"\" class=\"wp-image-1317\" srcset=\"https:\/\/www.ernasiletisim.com\/en\/wp-content\/uploads\/ernas-kabinet-kurulumu-page-inner-1024x1024.jpg 1024w, https:\/\/www.ernasiletisim.com\/en\/wp-content\/uploads\/ernas-kabinet-kurulumu-page-inner-300x300.jpg 300w, https:\/\/www.ernasiletisim.com\/en\/wp-content\/uploads\/ernas-kabinet-kurulumu-page-inner-150x150.jpg 150w, https:\/\/www.ernasiletisim.com\/en\/wp-content\/uploads\/ernas-kabinet-kurulumu-page-inner-768x768.jpg 768w, https:\/\/www.ernasiletisim.com\/en\/wp-content\/uploads\/ernas-kabinet-kurulumu-page-inner.jpg 1280w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n<\/div>\n<\/div>\n<\/div><\/div>\n\n\n\n<h2 class=\"wp-block-heading\">UNINTERRUPTED POWER SUPPLY SYSTEMS<\/h2>\n\n\n\n<p>In case of shortages, uninterrupted power supply systems, can generate electricity theough a battery or a set of batteries that are inside them. In addition to this these devices have the system to preserve the cricical load and stabilize the voltage during the voltage fluctuations of the circuit.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>ROOM CONSTRUCTION In order for all the service offered through host computer \u2013 internet \u2013 local network there need to be a suitable computer room. This makes computer rooms one of the most crucial elements of information infrastructure, and places very high importance to data centers construction. For the construction of the computer room, the [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":1019,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[43,44],"tags":[36,153,154,155],"class_list":["post-642","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-solutions","category-data-center","tag-data-center","tag-ready-to-use-datacenter","tag-turn-key-datacenter","tag-system-room"],"_links":{"self":[{"href":"https:\/\/www.ernasiletisim.com\/en\/wp-json\/wp\/v2\/posts\/642","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.ernasiletisim.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.ernasiletisim.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.ernasiletisim.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.ernasiletisim.com\/en\/wp-json\/wp\/v2\/comments?post=642"}],"version-history":[{"count":179,"href":"https:\/\/www.ernasiletisim.com\/en\/wp-json\/wp\/v2\/posts\/642\/revisions"}],"predecessor-version":[{"id":1604,"href":"https:\/\/www.ernasiletisim.com\/en\/wp-json\/wp\/v2\/posts\/642\/revisions\/1604"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.ernasiletisim.com\/en\/wp-json\/wp\/v2\/media\/1019"}],"wp:attachment":[{"href":"https:\/\/www.ernasiletisim.com\/en\/wp-json\/wp\/v2\/media?parent=642"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.ernasiletisim.com\/en\/wp-json\/wp\/v2\/categories?post=642"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.ernasiletisim.com\/en\/wp-json\/wp\/v2\/tags?post=642"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}